Quote:
|
Originally Posted by tetsujin Really, a day each!!!
I might need you help here dude!
I I want to replace these 8j with 8.5 in the future and move these up front and move on those old 7j's of your.
Will it really be such a big job to flare them out?? I will be re-painting too.  |
the day consisted of:
-take out old rubbish inner arch molding, fling as far as you can without getting rocks in your face
-
-
-
-
-
-
-
-

line up the arch with thumb
-
-
-
-

repeat
-
-
-
-then apply filler
-
-sand
-fill in air bubbles
-
-sand
-

eye the arch for smoothness
-prime
-
-

whole day spent
its better to devote more time to them to get them perfect. i still need to work on mine more. as the rear are rotten and need a good grind.