View Single Post
Old 16-02-2007, 11:29   #2 (permalink)
Phil
7JZGTE
 
Phil's Avatar




 
Join Date: Jul 2004
Location: Birmingham
Posts: 6,895
We have a little progress in the workshop at Garage D

Excuse the filthy engine and gearbox, it's there for the mockup. once everything fabricated, it's coming out for a little work

The engine mounts wern't with the engine, and would have been around 14 inches off fitting to the S15 crossmember, so the guys had a little play with some of the equipment they have on hand.











Everything is still supported by jacks and frame work, but the final measurements have been taken, and only a little work remains to get this little lot mounted correctly.







I'm having a little play with where the turbo is going to sit. If we've got to make a manifold from scratch we're looking at doing something a little interesting. The main focus being clearing the exhaust into the other side of the engine bay so it doesn't have to dodge the steering rack and more importantly my fat feet.



We got a crappy old seat in there to take measurements of how the framework around the gearbox will effect my driving position. Long and short of it is that it won't at all . The only sacrafice we have to make is the clutch rest, which is'nt to much of a problem in a car that it's quite unlikely I'll commute in




Last edited by Phil : 27-06-2007 at 20:13.
Phil is offline   Reply With Quote