View Single Post
Old 06-12-2007, 12:50   #15 (permalink)
Phil
7JZGTE
 
Phil's Avatar




 
Join Date: Jul 2004
Location: Birmingham
Posts: 6,895
The S15 is back at DW after Garage D finished with the manifold and exhaust. We've had a minor hiccup with the wastegate position interfering with the alternator, so it looks like I'll be getting the chopsaw out, and ruining all Julians lovely work , but in the mean time, I've managed to find some time over the past couple of days to tick a major job off the list .
I've re-engineered the gear lever and linkage mechanism, to correct for the engine and gearbox being pushed so far back into the car..
What an absolute ball ache of a job! I'm pretty chuffed with the result though

Before and After:





The shortened selector extension shaft


All bolted in, finished and tested.



Phil is offline   Reply With Quote