View Single Post
Old 11-12-2007, 21:27   #16 (permalink)
Phil
7JZGTE
 
Phil's Avatar




 
Join Date: Jul 2004
Location: Birmingham
Posts: 6,895
Okay, it's been a mad few days working on the S15. I've really got over some big hurdles, so I've got a pretty big smile on my face at the moment

I did the gear linkage, and I've now managed to fit a custom Wilwood clutch pedal with rear facing master cylinder (no pics yet). I'm working on the handbrake mechanism, and I've managed to relocate the Alternator on the 2JZ motor to the other side of the engine (after welding the bracket 4 times before I managed to get it to not warp with the heat of each new weld )

The engine is coming together nicely, and CrazyAnt just bought a tig welder, so we'll have some more of the custom work done in a more timely manor from this point on hopefully.
Today we spent half the day listing everything we need to complete the fuel system. Damn this is going to be expensive .
Tomorrow we'll be going through the massive amount of other custom hoses, connections, bolts and fixings hopefully, so if I need to I can work over Christmas to get more done..

We've just got ramps, so watch this space for some hasty crafting action

Sorry the pictures arn't that great, my camera's decided to act up.







Phil is offline   Reply With Quote