{} after a pair of work reverse lips ASAP, something preferably above 5.5” dish. all companies are saying 6/7 weeks but need them built up in the next few weeks.
I got pair of work rear barrels 7.5” lip. Was going to make 18x15 for a widebody Let me know if you are interested as my project is on hold
Do you need stepped lips or flat? I do have some 5.5 inch lips with a ridge. will take some photos.... Whats a reverse lip?